This is our last bathroom installation of 2018, and with this one we did go out with a bang. We fully took this one back to brick and started again, we also moved the suit around a bit. The old bath was on the back wall and we changed this to a very spacious walk in shower with built in recess. The towel warmer was moved to the opposite wall. The toilet was shuffled along a bit, due to this we had to alter the external soil stack. The basin was changed for these lovely vanity units to give that needed storage space.
We fully re boarded the walls throughout, this gives the tiling a better finish. As always we lined the floor using no more ply cement based board prior to tiling. This adds greater strength and stability for the tiles. New spot lights went in and 2 cool Bluetooth speakers mounted in the ceiling.